Scheme ID: 20099251 Name of Scheme: Rampur bihari PWS No. of Villages: 3 No. of Habitation Covered: 8
Total Population Covered: 2995 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jan-0222 Actual Date of Completion (Capex): 23-Oct-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.692
2 HDPE 90 3.378
3 HDPE 110 1.844
4 HDPE 125 .542
5 HDPE 140 .483
HSC Connection
Sno. Total Nos.
Other Details
2.46
0.00
2.53
22-Oct-2023