Project Completion Certificate (Ground Water)
Scheme ID: 20099294 Name of Scheme: Bhadaura PWS No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 300 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 19-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 .665
HSC Connection
Sno. Total Nos.
Other Details
0.63
0.00
0.65
18-Mar-2025
18-Jun-2025