Project Completion Certificate (Ground Water)
Scheme ID: 20099301 Name of Scheme: SIKRORI GRAMM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1127 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 22-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL(REPAIRING) NR SIKRORI 26.987955 79.823546
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 200/51 SIKRORI 26.987955 79.823546
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHR(REPAIRING) 300/18 SIKRORI 26.987955 79.823546
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI(REPAIRING) 0.00 0.00 NR
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.07 DISTRIBUTION
2 HDPE 90 1.62 DISTRIBUTION
3 HDPE 110 0.76 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 211
Other Details
0.96
0.96
0.81
26-Jul-2024