Project Completion Certificate (Ground Water)
Scheme ID: 20099311 Name of Scheme: ARIYAWAN WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 11
Total Population Covered: 3794 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Oct-2024 Actual Date of Completion (Capex): 09-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MS PIPE (150MM AND 300MM) 63.8 M / 26 M ARIYAWAN 26.417895 81.528965
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 800 LPM / 56 M ARIYAWAN 26.417895 81.528965
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250KL / 18M ARIYAWAN 26.417895 81.528965
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE (63MM-200MM) 200 16.804
HSC Connection
Sno. Total Nos.
1 678
Other Details
4.53
0.00
4.51
12-Jan-2025
15-Apr-2025