| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099327 | Name of Scheme: ISMAILPUR WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 5 |
| Total Population Covered: 2799 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 24-Nov-2024 | Actual Date of Completion (Capex): 17-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | PLAIN PIPE 200MM | 42.50 | ISMAILPUR | 26.15287 | 81.95004 |
| 2 | SLOTTED PIPE 200MM | 9 | ISMAILPUR | 26.15287 | 81.95004 |
| 3 | PLAIN PIPE 150MM | 6 | ISMAILPUR | 26.15287 | 81.95004 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUPMP | 125 | ISMAILPUR | 26.15287 | 81.95004 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 100KL/18MTR | ISMAILPUR | 26.15287 | 81.95004 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 14.53 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | .701 | |
| 2 | HDPE PIPE | 75 | 1.158 | |
| 3 | HDPE PIPE | 63 | 27.521 | |
| 4 | HDPE PIPE | 110 | .521 | |
| 5 | HDPE PIPE | 125 | .039 | |
| 6 | HDPE PIPE | 140 | .04 | |
| 7 | HDPE PIPE | 180 | .094 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 620 |