Scheme ID: 20099327 Name of Scheme: ISMAILPUR WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 5
Total Population Covered: 2799 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2024 Actual Date of Completion (Capex): 17-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 PLAIN PIPE 200MM 42.50 ISMAILPUR 26.15287 81.95004
2 SLOTTED PIPE 200MM 9 ISMAILPUR 26.15287 81.95004
3 PLAIN PIPE 150MM 6 ISMAILPUR 26.15287 81.95004
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUPMP 125 ISMAILPUR 26.15287 81.95004
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 100KL/18MTR ISMAILPUR 26.15287 81.95004
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 14.53
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 .701
2 HDPE PIPE 75 1.158
3 HDPE PIPE 63 27.521
4 HDPE PIPE 110 .521
5 HDPE PIPE 125 .039
6 HDPE PIPE 140 .04
7 HDPE PIPE 180 .094
HSC Connection
Sno. Total Nos.
1 620
Other Details
4.02
0.00
3.97
19-Sep-2024
28-Nov-2024