| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099338 | Name of Scheme: Chateni | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2124 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2023 |
| Date of Completion (As per Contract): 30-Apr-2023 | Actual Date of Completion (Capex): 31-Dec-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 11/66.40 | CHATENI | 26.27'06''N | 79.88'12''E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 250/71 | CHATENI | 26.27'06''N | 79.88'12''E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 75/14 | CHATENI | 26.27'06''N | 79.88'12''E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 7.25 | |
| 2 | HDPE | 90 | 1.31 | |
| 3 | HDPE | 110 | 0.22 | |
| 4 | HDPE | 140 | 0.254 | |
| 5 | HDPE | 160 | 0.018 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 471 |