| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099386 | Name of Scheme: MakhaubA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1510 | Base Year: 2023 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 13-Apr-2024 | Actual Date of Completion (Capex): 30-Apr-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell (330 LPM) | 14/57.51 | Makhauba | 25.503528 | 81.196732 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible pump (7.5 HP) | 330 | Makhauba | 25.503528 | 81.196732 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | Makhauba | 25.503528 | 81.196732 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K9 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 75 | 672.30 | |
| 2 | HDPE | 90 | 536.60 | |
| 3 | HDPE | 110 | 269.50 | |
| 4 | HDPE | 125 | 648.20 | |
| 5 | HDPE | 140 | 131.50 | |
| 6 | HDPE | 160 | 12.10 | |
| 7 | HDPE | 180 | 211.30 | |
| 8 | HDPE | 200 | 244.30 | |
| 9 | HDPE | 63 | 4518.80 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 377 |