Project Completion Certificate (Ground Water)
Scheme ID: 20099398 Name of Scheme: GOpalpur Urf J block water Supply System No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2670 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Sep-2023 Actual Date of Completion (Capex): 25-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.07/149.55 Gopalpur 26.952896 83.267167
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 36/43 Gopalpur 26.952896 83.267167
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 175/14 Gopalpur 26.953002 83.26677
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 9.372.8 Completed
2 HDPE 75 2.561 Completed
3 HDPE 90 0.910 Completed
4 HDPE 110 1.450 Completed
5 HDPE 140 0.486 Completed
HSC Connection
Sno. Total Nos.
Other Details
2.28
0.00
2.50
24-Jul-2024
11-Dec-2024