| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099398 | Name of Scheme: GOpalpur Urf J block water Supply System | No. of Villages: 2 | No. of Habitation Covered: 5 |
| Total Population Covered: 2670 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 15-Sep-2023 | Actual Date of Completion (Capex): 25-Jul-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21.07/149.55 | Gopalpur | 26.952896 | 83.267167 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 36/43 | Gopalpur | 26.952896 | 83.267167 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Over Head Tank-1 | 175/14 | Gopalpur | 26.953002 | 83.26677 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.035 | Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.372.8 | Completed |
| 2 | HDPE | 75 | 2.561 | Completed |
| 3 | HDPE | 90 | 0.910 | Completed |
| 4 | HDPE | 110 | 1.450 | Completed |
| 5 | HDPE | 140 | 0.486 | Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |