Project Completion Certificate (Ground Water)
Scheme ID: 20099403 Name of Scheme: Bhikhdev No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3973 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Apr-2024 Actual Date of Completion (Capex): 25-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 36.44/224.88 BHIKHDEV 26.60025 79.90967
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 1000/68 BHIKHDEV 26.60025 79.90967
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/20 BHIKHDEV 26.60025 79.90967
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.0085
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.859
2 HDPE 90 1.056
3 HDPE 110 0.275
4 HDPE 140 1.905
5 HDPE 160 1.029
6 HDPE 200 0.120
HSC Connection
Sno. Total Nos.
1 831
Other Details
4.35
0.00
3.55
09-Apr-2024
10-Apr-2024