| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099435 | Name of Scheme: PAHARPUR | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2670 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Aug-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 10/54.54 | PAHARPUR | 25.6472523" | 80.9843166" |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 540/60 | PAHARPUR | 25.6472523" | 80.9843166" |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175/16 | PAHARPUR | 25.6472523" | 80.9843166" |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K,9 | 100 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.2181 | |
| 2 | HDPE | 140 | 0.1243 | |
| 3 | HDPE | 125 | 0.4757 | |
| 4 | HDPE | 110 | 2.2832 | |
| 5 | HDPE | 90 | 0.7824 | |
| 6 | HDPE | 75 | 2.1762 | |
| 7 | HDPE | 63 | 6.2441 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 440 |