Project Completion Certificate (Ground Water)
Scheme ID: 20099437 Name of Scheme: SALEMPUR GOLI No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3407 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/139.90 SALEMPUR COLI 25'.54392916" N 81 .0A227 77 1" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 800/60 SALEMPUR COLI 25'.54392916" N 81 .0A227 77 1" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 250/14 SALEMPUR COLI 25'.54392916" N 81 .0A227 77 1" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.t. K-9 125 0.02150
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.531
2 HDPE 180 0.796
3 HDPE 160 1.187
4 HDPE 125 0.582
5 HDPE 110 1.4715
6 HDPE 90 0.8906
7 HDPE 75 3.1273
8 HDPE 63 7.8383
HSC Connection
Sno. Total Nos.
1 791
Other Details
3.52
0.00
3.52
31-May-2025
01-Jun-2025