| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099492 | Name of Scheme: THAREPAH WATER SUPPLY SCHEME | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 1885 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 17-Apr-2023 | Actual Date of Completion (Capex): 17-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21 M/213.29 M | THAREPAH | 26.235994 | 80.464902 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 393 LPM/62 M | THAREPAH | 26.235994 | 80.464902 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/12 M (ZINC ALAM TANK) | THAREPAH | 26.235994 | 80.464902 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K-7 | 100 | 0.022 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/PN-6 | 63 | 4.1320 | |
| 2 | HDPE/PN-6 | 75 | 0.5736 | |
| 3 | HDPE/PN-6 | 90 | 0.0583 | |
| 4 | HDPE/PN-6 | 110 | 1.2633 | |
| 5 | HDPE/PN-6 | 140 | 0.2160 | |
| 6 | HDPE/PN-6 | 160 | 0.3250 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 375 |