Scheme ID: 20099637 Name of Scheme: JALALPUR KALA & JALILPUR MVS (O) No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2821 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 18-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.06/90.54 Jalalpur kalan 28.8533 78.3386
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 560/40 Jalalpur kalan 28.8533 78.3386
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 175/12 Jalalpur kalan 28.8532 78.3385
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 125 0.02113
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.040
2 PN-6 PE100/HDPE 75 0.147
3 PN-6 PE100/HDPE 63 7.3627
4 PN-6 PE100/HDPE 110 0.208
5 PN-6 PE100/HDPE 125 0.059
6 PN-6 PE100/HDPE 140 1.430
7 PN-6 PE100/HDPE 160 0.074
HSC Connection
Sno. Total Nos.
1 459
Other Details
2.01
0.00
1.94
03-May-2025
04-May-2025