Project Completion Certificate (Ground Water)
Scheme ID: 20099738 Name of Scheme: SAURIKH DEHAT GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3454 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 16-Aug-2024 Actual Date of Completion (Capex): 16-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21/131.30 SAURIKH DEHAT 79.494726 27.027349
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump-1 750 LPM/61 M SAURIKH DEHAT 79.494726 27.027349
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225 KL/ 14 M SAURIKH DEHAT 79.494726 27.027349
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.042 Rising main
2 DI 200 0.0045 Rising main
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.58 Distribution
2 HDPE 63 5.96 Distribution
3 HDPE 110 0.949 Distribution
4 HDPE 140 1.96 Distribution
5 HDPE 160 0.224 Distribution
6 HDPE 180 0.780 Distribution
HSC Connection
Sno. Total Nos.
1 621
Other Details
3.36
3.34
3.37
19-Jul-2024
20-Jul-2024