| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099784 | Name of Scheme: MADARIYA MIHIPURWA (VPL) PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 3326 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 07-Dec-2024 | Actual Date of Completion (Capex): 31-Dec-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 30/174.75 | Madariya | 28.00099 | 81.490535 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT-PUMP | 42.6/45 | Madariya | 28.00099 | 81.490535 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZnAl Tank | 225/14 | Madariya | 28.00099 | 81.490535 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K-7 | 150 | 0.031 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.514 | |
| 2 | HDPE | 75 | 0.389 | |
| 3 | HDPE | 90 | 0.375 | |
| 4 | HDPE | 110 | 0.173 | |
| 5 | HDPE | 125 | 0.068 | |
| 6 | HDPE | 160 | 0.988 | |
| 7 | HDPE | 180 | 0.314 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |