| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099799 | Name of Scheme: Patara Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4030 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 23-Feb-2025 | Actual Date of Completion (Capex): 24-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24/91.02 | Patra | 26.8077 | 83.4914 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 48/43 | Patra | 26.8077 | 83.4914 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Overhead Tank-1 | 225/16 | Patra | 26.8077 | 83.4914 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.030 | Laying Completed |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.162 | Laying Completed |
| 2 | HDPE | 75 | 0.691 | Laying Completed |
| 3 | HDPE | 90 | 0.576 | |
| 4 | HDPE | 110 | 0.140 | Laying Completed |
| 5 | HDPE | 140 | 0.007 | Laying Completed |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 554 |