Project Completion Certificate (Ground Water)
Scheme ID: 20099803 Name of Scheme: Madhopur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 2230 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-Jul-2024 Actual Date of Completion (Capex): 01-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 125/14 Madhopur 26.7881 83.5783
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.627 Laying Completed
2 HDPE 75 0.53 Laying Completed
3 HDPE 140 0.856 Laying Completed
HSC Connection
Sno. Total Nos.
1 373
Other Details
1.57
0.00
1.57
31-Mar-2026
01-Apr-2026