Scheme ID: 20099821 Name of Scheme: Kaidaha Khurd Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1480 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Feb-2025 Actual Date of Completion (Capex): 11-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.00/123.85 Kaidaha Khurd 26.486557 83.427519
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 21/41 Kaidaha Khurd 26.486564 83.42793
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Over Head Tank-1 75/14 Kaidaha Khurd 26.48661 83.42748
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.030 Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.436 Completed
2 HDPE 90 0.728 Completed
HSC Connection
Sno. Total Nos.
1 254
Other Details
1.34
0.00
1.59
10-May-2025