Project Completion Certificate (Ground Water)
Scheme ID: 20099824 Name of Scheme: Sanda Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2820 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Feb-2025 Actual Date of Completion (Capex): 26-Feb-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/109.85 Saranda 26.773652 83.501491
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 36/39 Saranda 26.773652 83.501491
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 175/12 Saranda 26.773456 83.501491
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.030 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.846 Laying Completed
2 HDPE 110 0.773 Laying Completed
HSC Connection
Sno. Total Nos.
1 390
Other Details
1.70
0.00
1.76
25-Feb-2024
19-Nov-2024