Project Completion Certificate (Ground Water)
Scheme ID: 20100154 Name of Scheme: SHAH ALIPUR UTTAMCHAND WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1640 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 19-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 30.03/ 125.34 Shahlipur Uttamchand 29.28212 78.578313
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 350 / 56 Shahlipur Uttamchand 29.28212 78.578313
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 100 / 18 Shahlipur Uttamchand 29.28212 78.578313
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.0807
2 HDPE 75 1.0198
3 HDPE 90 0.4912
4 HDPE 110 0.1183
5 HDPE 125 0.323
6 HDPE 140 0.050
HSC Connection
Sno. Total Nos.
1 266
Other Details
1.60
0.00
1.61
19-Nov-2025
20-Nov-2025