Project Completion Certificate (Ground Water)
Scheme ID: 20100194 Name of Scheme: ABIDNAGAR HARBANS WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1343 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 28-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 28 / 150.15 Abdipur Harbansh 29.517032 78.439817
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 300 / 60 Abdipur Harbansh 29.517032 78.439817
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 / 16 Abdipur Harbansh 29.517032 78.439817
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.005
2 HDPE 75 0.931
3 HDPE 90 0.494
4 HDPE 110 0.092
5 HDPE 125 0.018
6 HDPE 140 1.014
HSC Connection
Sno. Total Nos.
1 301
Other Details
1.54
0.00
1.80
28-Oct-2025
29-Oct-2025