| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100210 | Name of Scheme: MAHAMMADPUR KAIMHARA JJM SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1074 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-May-2023 | Actual Date of Completion (Capex): 11-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 12/111 | Parsdaha | 27.885462 | 80.831654 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Tubewells | 215/38 | Parsdaha | 27.885262 | 80.831054 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 75/12 | Parsdaha | 27.885606 | 80.831471 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 80 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.1765 | |
| 2 | HDPE | 75 | 0.0085 | |
| 3 | HDPE | 63 | 1.9245 | |
| 4 | HDPE | 110 | 1.072 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 156 |