| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100227 | Name of Scheme: AKBARPUR DEVDAS WALA WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 1911 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 02-Jan-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Sumersible | 30.7 / 125.5 | AKBARPUR DEVDAS WALA | 29.5061 | 78.122938 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible | 380 /55 | AKBARPUR DEVDAS WALA | 29.5061 | 78.122938 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125 / 12 | AKBARPUR DEVDAS WALA | 29.5061 | 78.122938 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.034 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6-Class PE-100 | 63 | 5.8256 | |
| 2 | HDPE Pipe PN-6-Class PE-100 | 75 | 0.175 | |
| 3 | HDPE Pipe PN-6-Class PE-100 | 110 | 2.2051 | |
| 4 | HDPE Pipe PN-6-Class PE-100 | 125 | 0.332 | |
| 5 | HDPE Pipe PN-6-Class PE-100 | 140 | 0.0096 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 311 |