Project Completion Certificate (Ground Water)
Scheme ID: 20100433 Name of Scheme: Kukarkat PWS No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3225 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 30-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.11M/90.69M Kukarkat 26.916268 79.384608
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 750LPM/51M Kukarkat 26.916268 79.384608
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225KL/14M Kukarkat 26.916268 79.384608
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.063
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.076
2 HDPE 90 0.6945
3 HDPE 110 1.498
4 HDPE 140 0338
5 HDPE 160 0.598
6 HDPE 180 0.514
HSC Connection
Sno. Total Nos.
1 569
Other Details
2.69
0.00
2.81
19-Feb-2024
31-Mar-2025