| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100524 | Name of Scheme: PIPARIA BIRSINGHPUR GRAM PANCHAYAT MULTI VILLAGE WATER SUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 1610 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 28-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 12.00/78.00 | PIPARIA BIRSINGHPUR | 28.195502 | 80.201747 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP -1 | 8.34/46M | PIPARIA BIRSINGHPUR | 28.195502 | 80.201747 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 50 KL -12 M | PIPARIA BIRSINGHPUR | 28.195515 | 80.201735 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 9.769 | |
| 2 | HDPE/6KG | 75 | 4.147 | |
| 3 | HDPE/6KG | 90 | 1.610 | |
| 4 | HDPE/6KG | 110 | 1.090 | |
| 5 | HDPE/6KG | 140 | 0.532 | |
| 6 | HDPE/6KG | 160 | 1.048 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 278 |