Project Completion Certificate (Ground Water)
Scheme ID: 20100650 Name of Scheme: MAHESH PUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1632 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Apr-2024 Actual Date of Completion (Capex): 18-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.01 / 74.39 MAHESH PUR 26.446763 81.728506
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 150 LPM / 54 M MAHESH PUR 26.446763 81.728506
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50 KL / 16 M MAHESH PUR 26.446763 81.728506
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0186
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.698
2 HDPE 90 1.152
3 HDPE 110 0.864
4 HDPE 125 0.200
5 HDPE 140 0.240
HSC Connection
Sno. Total Nos.
1 319
Other Details
1.69
0.00
1.65
08-Mar-2025
09-Jun-2025