Project Completion Certificate (Ground Water)
Scheme ID: 20100657 Name of Scheme: KUVARI W/S SCHEME (VSA) No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 430 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-May-2025 Actual Date of Completion (Capex): 19-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 7.5m/60.55m Kuwari 25.7247 83.835586
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 88LPM/49M Kuwari 25.7247 83.835586
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50KL/12M Kuwari 25.7247 83.835586
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.039
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.355
2 HDPE 75 0.449
3 HDPE 110 0.015
HSC Connection
Sno. Total Nos.
1 185
Other Details
1.58
0.00
1.40
19-Apr-2026
20-Apr-2026