Project Completion Certificate (Ground Water)
Scheme ID: 20100682 Name of Scheme: Salahuddinpur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1610 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 17-May-2024 Actual Date of Completion (Capex): 24-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 18.04/115.5 Salauddinpur 26.526547 82.576143
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 7.5 HP 21/45 Salauddinpur 26.526547 82.576143
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 100/14 Salauddinpur 26.526544 82.576143
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.031
2 DI-K7 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.408
2 HDPE Pipe PN-6: Class PE-100 110 0.397
3 HDPE Pipe PN-6: Class PE-100 140 0.886
HSC Connection
Sno. Total Nos.
1 250
Other Details
161.02
161.02
160.48
24-Feb-2025
25-Feb-2025