| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100682 | Name of Scheme: Salahuddinpur Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1610 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 17-May-2024 | Actual Date of Completion (Capex): 24-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 18.04/115.5 | Salauddinpur | 26.526547 | 82.576143 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 7.5 HP | 21/45 | Salauddinpur | 26.526547 | 82.576143 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 100/14 | Salauddinpur | 26.526544 | 82.576143 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.031 | |
| 2 | DI-K7 | 100 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 3.408 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.397 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 140 | 0.886 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 250 |