Project Completion Certificate (Ground Water)
Scheme ID: 20100736 Name of Scheme: BANSATHI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 4
Total Population Covered: 3378 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-May-2023 Actual Date of Completion (Capex): 26-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 26 M/220.82 M Bansathi 26.568799 80.160127
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 725 LPM/55 M Bansathi 26.568799 80.160127
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200 KL/12 M (Zinc Alum Tank) Bansathi 26.568799 80.160127
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K-7 150 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6 63 8.459
2 HDPE/PN-6 75 1.575
3 HDPE/PN-6 90 0.808
4 HDPE/PN-6 110 0.380
5 HDPE/PN-6 140 0.264
6 HDPE/PN-6 160 0.393
HSC Connection
Sno. Total Nos.
1 611
Other Details
2.27
0.00
0.00
04-Jan-2025
05-Jan-2025