Project Completion Certificate (Ground Water)
Scheme ID: 20100744 Name of Scheme: Saihata Village Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2950 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 18-Nov-2024 Actual Date of Completion (Capex): 19-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 17.02/96.76 Saihata 29.4349800 77.337511
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 170LPM/45Mtr Saihata 29.4349800 77.337511
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 0.009 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 0.58 OK
2 HDPE 75 0.22 OK
3 HDPE 110 0.89 OK
HSC Connection
Sno. Total Nos.
1 138
Other Details
1.00
1.00
0.95
19-Feb-2026
12-Mar-2026