| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100744 | Name of Scheme: Saihata Village Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2950 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 18-Nov-2024 | Actual Date of Completion (Capex): 19-Feb-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 17.02/96.76 | Saihata | 29.4349800 | 77.337511 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 170LPM/45Mtr | Saihata | 29.4349800 | 77.337511 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | 0.009 | OK |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 0.58 | OK |
| 2 | HDPE | 75 | 0.22 | OK |
| 3 | HDPE | 110 | 0.89 | OK |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 138 |