Project Completion Certificate (Ground Water)
Scheme ID: 20100761 Name of Scheme: NARWAL - PRATAPPUR NARWAL GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1051 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-May-2023 Actual Date of Completion (Capex): 26-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 8 M/69.55 M NARWAL - PRATAPPUR NARWAL 26.224978 80.440442
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 213 LPM/62 M NARWAL - PRATAPPUR NARWAL 26.224978 80.440442
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 No OHT NARWAL - PRATAPPUR NARWAL 26.224978 80.440442
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K-7 100 0.009
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6 63 2.288
2 HDPE/PN-6 75 0.295
3 HDPE/PN-6 90 0.067
4 HDPE/PN-6 110 0.079
5 HDPE/PN-6 140 0.363
HSC Connection
Sno. Total Nos.
1 250
Other Details
0.79
0.00
0.00
16-Dec-2024
17-Dec-2024