Project Completion Certificate (Ground Water)
Scheme ID: 20100803 Name of Scheme: SUDANPUR No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1640 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 14-Aug-2023 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18 M / 170 m SUDANPUR 25°.592135 N 81.095302"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 350 LPM / 60 M SUDANPUR 25°.592135 N 81.095302"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 100 KL / 14 M SUDANPUR 25°.592135 N 81.095302"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.t. K-9 80 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.4036
2 HDPE 160 0.1781
3 HDPE 140 0.1758
4 HDPE 125 1.53
5 HDPE 110 0.8166
6 HDPE 90 0.9744
7 HDPE 75 0.6332
8 HDPE 63 2.3511
HSC Connection
Sno. Total Nos.
1 404
Other Details
1.74
0.00
1.71
09-Sep-2024
12-Sep-2024