| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100806 | Name of Scheme: GHANGHAOL | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3970 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 19-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well 800 LPM | 20 / 121.12 | Ghanghaol | 25.806058 | 80.842440 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 20 HP Submersible Pump | 800 / 55 | Ghanghaol | 25.806058 | 80.842440 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 250 KL / 12 M | Ghanghaol | 25.806653 | 80.842573 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.014 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 PE 100 | 200 | 0.0293 | |
| 2 | HDPE PN-6 PE-100 | 180 | 0.298 | |
| 3 | HDPE PN-6 PE 100 | 160 | 0.109 | |
| 4 | HDPE PN-6 PE 100 | 140 | 0.078 | |
| 5 | HDPE PN-6 PE 100 | 125 | 0.466 | |
| 6 | HDPE PN-6 PE 100 | 110 | 0.0705 | |
| 7 | HDPE PN-6 PE 100 | 90 | 0.536 | |
| 8 | HDPE PN-6 PE 100 | 75 | 1.3717 | |
| 9 | HDPE PN-6 PE 100 | 63 | 3.77738 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 573 |