Project Completion Certificate (Ground Water)
Scheme ID: 20100807 Name of Scheme: BHAVANIPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1960 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-May-2023 Actual Date of Completion (Capex): 26-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21 M/319.96 M BHAVANIPUR 26.582898 80.207007
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 400 LPM/55 M BHAVANIPUR 26.582898 80.207007
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/12 M (ZINC ALAM TANK) BHAVANIPUR 26.582898 80.207007
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K-7 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6 63 4.126
2 HDPE/PN-6 75 0.576
3 HDPE/PN-6 90 0.136
4 HDPE/PN-6 110 0.473
5 HDPE/PN-6 140 0.896
6 HDPE/PN-6 160 0.257
HSC Connection
Sno. Total Nos.
1 367
Other Details
1.66
0.00
0.00
25-Dec-2024
26-Dec-2024