Project Completion Certificate (Ground Water)
Scheme ID: 20100816 Name of Scheme: SHAHIPUR No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1820 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 25-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 380 LPM" 18.01 M / 141.24 M Shahipur 25.834992 80.938977
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 10 HP Submersible Pump 380 LPM / 55 M Shahipur 25.834992 80.938977
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL / 12 M Shahipur 25.834957 80.938962
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 100 0.013
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN 6 PE 100 140 0.452
2 HDPE PN 6 PE 100 125 0.3592
3 HDPE PN 6 PE 100 110 0.512
4 HDPE PN 6 PE 100 90 1.6197
5 HDPE PN 6 PE 100 75 1.5566
6 HDPE PN 6 PE 100 63 1.8406
HSC Connection
Sno. Total Nos.
1 362
Other Details
1.93
1.93
1.93
24-Sep-2024
25-Sep-2024