Project Completion Certificate (Ground Water)
Scheme ID: 20100818 Name of Scheme: YOHAN No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 2100 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 13-Aug-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 11/38.50 Yohan 25.96121183" 81.07908"
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 450/60 Yohan 25.96121183" 81.07908"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 150/14 Yohan 25.96121183" 81.07908"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 80 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 180 0.180
2 HDPE 160 0.3633
3 HDPE 140 0.555
4 HDPE 125 0.2851
5 HDPE 110 0.298
6 HDPE 90 0.10802
7 HDPE 75 0.921
8 HDPE 63 0.44952
HSC Connection
Sno. Total Nos.
1 360
Other Details
2.57
0.00
2.33
07-Feb-2025
08-Feb-2025