| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100818 | Name of Scheme: YOHAN | No. of Villages: 2 | No. of Habitation Covered: 4 |
| Total Population Covered: 2100 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 13-Aug-2024 | Actual Date of Completion (Capex): 30-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 11/38.50 | Yohan | 25.96121183" | 81.07908" |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 450/60 | Yohan | 25.96121183" | 81.07908"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT.1 | 150/14 | Yohan | 25.96121183" | 81.07908"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 80 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 180 | 0.180 | |
| 2 | HDPE | 160 | 0.3633 | |
| 3 | HDPE | 140 | 0.555 | |
| 4 | HDPE | 125 | 0.2851 | |
| 5 | HDPE | 110 | 0.298 | |
| 6 | HDPE | 90 | 0.10802 | |
| 7 | HDPE | 75 | 0.921 | |
| 8 | HDPE | 63 | 0.44952 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 360 |