Project Completion Certificate (Ground Water)
Scheme ID: 20100819 Name of Scheme: RASULPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1940 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2025 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.0/142.0 RASULPUR 25.80262684"N 81.22457409"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 420/55 RASULPUR 25.80262684"N 81.22457409"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125/12 RASULPUR 25.80262684"N 81.22457409"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I-K-9 80 0.033
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.6752
2 HDPE 180 1.0515
3 HDPE 160 1.333
4 HDPE 140 0.1966
5 HDPE 125 0.0862
6 HDPE 110 0.1118
7 HDPE 90 0.3676
8 HDPE 75 0.2766
9 HDPE 63 3.1225
HSC Connection
Sno. Total Nos.
1 380
Other Details
3.66
0.00
3.66
08-Dec-2024
09-Dec-2024