| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100859 | Name of Scheme: KOHRA - KIRAR GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 587 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Nov-2024 | Actual Date of Completion (Capex): 04-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 6 M/99.52 M | Kohra-Kirar | 26.073561 | 80.17211 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 121 LPM/50 M | Kohra-Kirar | 26.073561 | 80.17211 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | No OHT | Kohra-Kirar | 26.073561 | 80.17211 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K-7 | 100 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/PN-6 | 63 | 2.357 | |
| 2 | HDPE/PN-6 | 75 | 0.051 | |
| 3 | HDPE/PN-6 | 90 | 0.030 | |
| 4 | HDPE/PN-6 | 110 | 0.537 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 129 |