Project Completion Certificate (Ground Water)
Scheme ID: 20100859 Name of Scheme: KOHRA - KIRAR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 587 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Nov-2024 Actual Date of Completion (Capex): 04-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 6 M/99.52 M Kohra-Kirar 26.073561 80.17211
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump-1 121 LPM/50 M Kohra-Kirar 26.073561 80.17211
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 No OHT Kohra-Kirar 26.073561 80.17211
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K-7 100 0.015
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/PN-6 63 2.357
2 HDPE/PN-6 75 0.051
3 HDPE/PN-6 90 0.030
4 HDPE/PN-6 110 0.537
HSC Connection
Sno. Total Nos.
1 129
Other Details
0.43
0.00
0.00
04-Dec-2024
05-Dec-2024