Project Completion Certificate (Ground Water)
Scheme ID: 20100924 Name of Scheme: PARASPURA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 850 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 19-Jan-2025 Actual Date of Completion (Capex): 19-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain pipe 150mm dia 36 TW 25.898035 83.582398
2 Slotted pipe 150mm dia 15 TW 25.898035 83.582398
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible pump 80/42 TW 25.898035 83.582398
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 N/A N/A N/A 25.898035 83.582398
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 80 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE 100 63 5.18
2 HDPE PN6 PE 100 75 1.29
3 HDPE PN6 PE 100 90 0.435
4 HDPE PN6 PE 100 110 0.234
5 HDPE PN6 PE 100 125 0.193
6 HDPE PN6 PE 100 140 0.366
7 HDPE PN6 PE 100 160 0.048
HSC Connection
Sno. Total Nos.
Other Details
1.03
0.00
1.03
18-Jan-2025
19-Jan-2025