Project Completion Certificate (Ground Water)
Scheme ID: 20100926 Name of Scheme: AGOUS GRAMM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 7444 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 16-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 35.00/233.81 AGOUS ZONE-2 26.949333 79.722428
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 1100/60 AGOUS ZONE-2 26.949333 79.722428
2 SUBMERSIBLE PUMP 500/56 AGOUS ZONE-1 26.949333 79.722428
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 1 325/18 AGOUS ZONE-2 26.949333 79.722428
2 OHT-2 150/14 AGOUS ZONE-1 26.949333 79.722428
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.002 RISING MAINS
2 DI 100 0.043 RISING MAINS
3 DI 150 0.0285 RISING MAINS
4 DI 200 0.0058 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.036 DISTRIBUTION
2 HDPE 63 7.327 DISTRIBUTION
3 HDPE 110 2.66 DISTRIBUTION
4 HDPE 140 1.148 DISTRIBUTION
5 HDPE 160 0.306 DISTRIBUTION
6 HDPE 180 0.552 DISTRIBUTION
7 HDPE 200 0.757 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 1412
Other Details
6.63
6.52
5.62
19-Jul-2024
20-Jul-2024