Project Completion Certificate (Ground Water)
Scheme ID: 20100930 Name of Scheme: KISHAI JAGDISH PUR GRAMM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 5371 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 07-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 17.25/60.26 KISHAI JAGDISH PUR 26.9976322 79.5643828
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSSIBLE PUMP 1150/65 KISHAI JAGDISH PUR 26.9976322 79.5643828
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325/18 KISHAI JAGDISH PUR 26.9976322 79.5643828
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0015 RISING MAINS
2 DI 150 0.0280 RISING MAINS
3 DI 200 0.006 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 5.99 DISTRIBUTION
2 HDPE 63 4.98 DISTRIBUTION
3 HDPE 110 0.63 DISTRIBUTION
4 HDPE 140 0.471 DISTRIBUTION
5 HDPE 160 1.315 DISTRIBUTION
6 HDPE 180 0.647 DISTRIBUTION
7 HDPE 200 0.647 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 987
Other Details
4.81
4.74
4.76
10-Aug-2024
11-Aug-2024