Project Completion Certificate (Ground Water)
Scheme ID: 20100931 Name of Scheme: MITRASENPUR GRAMM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1259 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-Nov-2024 Actual Date of Completion (Capex): 03-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWLL 12/95.30 MITRASENPUR 26.961393 79.995669
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 250/64 MITRASENPUR 26.961393 79.995669
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 50/12 MITRASENPUR 26.961393 79.995669
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.002 RISING MAINS
2 DI 100 0.02315 RISING MAINS
3 DI 150 0.0054 RISING MAINS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.73 DISTRIBUTION
2 HDPE 63 2.128 DISTRIBUTION
3 HDPE 110 0.183 DISTRIBUTION
4 HDPE 140 0.176 DISTRIBUTION
HSC Connection
Sno. Total Nos.
1 284
Other Details
1.38
1.38
1.36
07-Aug-2024
08-Aug-2024