| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100937 | Name of Scheme: ALMAPUR GAHLAUT GRAMM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1090 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 14-Nov-2024 | Actual Date of Completion (Capex): 07-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell (Repairing) | 0.00/0.00 | ALMAPUR GAHLAUT | 27.12643 | 79.637285 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump-1 (Repairing) | 250 LPM/64 M | ALMAPUR GAHLAUT | 27.12643 | 79.637285 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 (Repairing) | 200/12 | ALMAPUR GAHLAUT | 27.12643 | 79.637285 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 0.00 | 0.00 | Rising Mains |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.18 | Distribution System |
| 2 | HDPE | 63 | 1.076 | Distribution |
| 3 | HDPE | 110 | 0.926 | Distribution |
| 4 | HDPE | 140 | 0.115 | Distribution |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 261 |