| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100938 | Name of Scheme: BHAVALPUR & AMBARPUR WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 16 |
| Total Population Covered: 4698 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Jun-2025 | Actual Date of Completion (Capex): 02-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 4 | BHAVALPUR | 26.06937 | 81.90798 |
| 2 | 300MM PLAIN PIPE | 54 | BHAVALPUR | 26.06937 | 81.90798 |
| 3 | 300MM SLOTTED PIPE | 8 | BHAVALPUR | 26.06937 | 81.90798 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 990LPM / 54MTR | BHAVALPUR | 26.06937 | 81.90798 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 300KL / 16MTR | BHAVALPUR | 26.06937 | 81.90798 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 150 | .025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 0.298 | |
| 2 | HDPE PIPE | 75 | .54 | |
| 3 | HDPE PIPE | 63 | 21.60 | |
| 4 | HDPE PIPE | 110 | .18 | |
| 5 | HDPE PIPE | 140 | 2.23 | |
| 6 | HDPE PIPE | 160 | .68 | |
| 7 | HDPE PIPE | 200 | 1.1 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 702 |