Project Completion Certificate (Ground Water)
Scheme ID: 20100941 Name of Scheme: TARAPUR KHURD TEJWAPUR RF PWS No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 6490 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2025 Actual Date of Completion (Capex): 15-Oct-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell Existing TARAPUR KHURD 27.564329 81.546361
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump 60/40 TARAPUR KHURD 27.564329 81.546361
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250/16 TARAPUR KHURD 27.564292 81.546427
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 RISING MAIN/DI-K7 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6; Class PE-100 63 5.134
2 HDPE Pipe PN-6; Class PE-100 75 0.176
3 HDPE Pipe PN-6; Class PE-100 90 1.285
4 HDPE Pipe PN-6; Class PE-100 110 0.586
5 HDPE Pipe PN-6; Class PE-100 140 0.033
6 HDPE Pipe PN-6; Class PE-100 160 0.008
7 HDPE Pipe PN-6; Class PE-100 200 0.073
HSC Connection
Sno. Total Nos.
1 466
Other Details
1.10
1.12
1.10
14-Nov-2023
16-Oct-2025