Project Completion Certificate (Ground Water)
Scheme ID: 20100948 Name of Scheme: DABATHUWA GARHI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1091 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.09 Mtr / 95.93 Mtr DABTHUA GARHI 29.064433 77.610722
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 100 LPM / 56 Mtr DABTHUA GARHI 29.064433 77.610722
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes DABTHUA GARHI 29.064433 77.610722
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.00335
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.511
2 HDPE 90 0.672
HSC Connection
Sno. Total Nos.
1 225
Other Details
1.28
1.28
1.00
31-Jan-2025
01-Feb-2025