Project Completion Certificate (Ground Water)
Scheme ID: 20100949 Name of Scheme: JURRANPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1332 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-Jun-2025 Actual Date of Completion (Capex): 13-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.16 Mtr / 99.08 Mtr JURRANPUR 28.915255 77.720091
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 150 LPM / 54 Mtr JURRANPUR 28.915255 77.720091
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Direct Pumping Schemes Direct Pumping Schemes JURRANPUR 28.915255 77.720091
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0061
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.138
2 HDPE 90 0.214
3 HDPE 110 0.215
4 HDPE 140 1.447
HSC Connection
Sno. Total Nos.
1 277
Other Details
1.19
1.19
0.98
03-Jan-2025
04-Jan-2025