Project Completion Certificate (Ground Water)
Scheme ID: 20100955 Name of Scheme: MOHD.PUR GUMI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 812 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 08-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 23.12 Mtr / 100 Mtr MOHD. GHUMI 28.922331 77.69625
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 100 LPM / 50 Mtr MOHD. GHUMI 28.922331 77.69625
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0068
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.332
2 HDPE 90 0.448
3 HDPE 125 0.521
HSC Connection
Sno. Total Nos.
1 126
Other Details
1.11
1.11
0.90
03-Oct-2024
02-Jan-2025