| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100955 | Name of Scheme: MOHD.PUR GUMI | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 812 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 08-May-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 23.12 Mtr / 100 Mtr | MOHD. GHUMI | 28.922331 | 77.69625 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 100 LPM / 50 Mtr | MOHD. GHUMI | 28.922331 | 77.69625 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0068 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 1.332 | |
| 2 | HDPE | 90 | 0.448 | |
| 3 | HDPE | 125 | 0.521 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 126 |