Project Completion Certificate (Ground Water)
Scheme ID: 20100987 Name of Scheme: GANGUWABARI & TIGHARA GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 9
Total Population Covered: 3240 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 14-Apr-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain pipe 150mm dia 9 TW 26.068748 83.490630
2 Plain pipe 300mm dia 42 TW 26.068748 83.490630
3 Slotted pipe 150mm dia 12 TW 26.068748 83.490630
4 Slotted pipe 300mm dia 12 TW 26.068748 83.490630
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 650LPM/42M TW 26.068748 83.490630
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zincalume tank 200/12 OHT 26.068748 83.490630
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K7 125 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN6 PE100 63 15.22
2 HDPE PN6 PE100 75 5.36
3 HDPE PN6 PE100 90 2.50
4 HDPE PN6 PE100 110 1.54
5 HDPE PN6 PE100 125 0.381
6 HDPE PN6 PE100 140 0.518
7 HDPE PN6 PE100 160 0.193
8 HDPE PN6 PE100 180 0.032
HSC Connection
Sno. Total Nos.
1 514
Other Details
273.11
0.00
274.79
14-Apr-2025
15-Apr-2025