Project Completion Certificate (Ground Water)
Scheme ID: 20101017 Name of Scheme: sirwan water supply scheme No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 3263 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 22-Nov-2024 Actual Date of Completion (Capex): 25-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/67.8 Sirwan 25.875775 82.99447
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 450/46 Sirwan 25.875775 82.99447
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150/12 Sirwan 25.875775 82.99447
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI PIPE 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.832
2 HDPE Pipe PN-6: Class PE-100 75 0.375
3 HDPE Pipe PN-6: Class PE-100 90 0.889
4 HDPE Pipe PN-6: Class PE-100 110 1.435
5 HDPE Pipe PN-6: Class PE-100 140 0.075
6 HDPE Pipe PN-6: Class PE-100 160 0.040
HSC Connection
Sno. Total Nos.
1 304
Other Details
2.25
2.25
2.25
28-Aug-2024
29-Aug-2024